Industrial & Manufacturing cleanup site — Restorical Research
Cascade Timber 3 US Oil
Thorne Rd & Maxwell, Tacoma, Pierce County
Restorical Research
Preliminary Site-Specific Analysis

This property has a documented history as a industrial and manufacturing facility going back to 1983. Historical insurance policies issued during those prior operations and through 1986 could recover the cleanup costs already paid.

This property operated as a log sort yard — identified in Port of Tacoma records as the Plum Creek Log Yard — with operations confirmed as early as 1983. An Ecology study conducted from November 1983 through June 1984 documented elevated heavy metals in surface water runoff from the site, and a U.S. Oil transmission pipeline on the property ruptured in 1991, releasing petroleum products into groundwater and surface water. Cleanup proceeded under a 1991 Agreed Order through the Standard Cleanup program, and the site has since received a No Further Action determination. That history could support an insurance cost recovery claim against carriers who issued insurance policies 40+ years ago.

Former Use
Former Industrial & Manufacturing
AddressThorne Rd & Maxwell, Tacoma, Pierce County
Historical UseIndustrial & Manufacturing
Est. Operating Since1983
StatusNo Further Action
Contamination & Investigation
Site Assessment Summary
ContaminantsHeavy metals and petroleum products detected in groundwater and surface water
Media ImpactedSoil, Groundwater, Surface Water
Regulatory ProgramMTCA — Standard Cleanup
Ecology Site #4593

Why Historical Insurance Policies May Be Accessible

Pre-1986 Commercial General Liability (CGL) policies were occurrence-based and did not contain an effective pollution exclusion in Washington. If contamination occurred while those policies were active, those historical insurance carriers may still have a legal obligation to fund the cleanup costs, even if the business closed or the property changed hands.

Heavy metal contamination at this site originated from log sort yard operations that were already under way by 1983 — years before the 1986 shift from occurrence-based to claims-made CGL policies. The Ecology study documenting metals in surface water runoff, the subsequent Agreed Order, and the remediation of petroleum contamination from the pipeline rupture represent a documented cost trail tied to infrastructure and operations in place during the pre-1986 policy window. Historical carriers who covered the log yard operators during that period may remain obligated to recover those cleanup expenditures.

Restorical's role is to locate viable historical policies, determine whether a successful cost recovery claim is possible, and assist our clients and their legal counsel to obtain insurance coverage for costs already incurred. Restorical's forensic accounting team works to re-establish and document past cleanup expenditures, ensuring the strongest possible basis for recovery.

Recovering Costs from an Older Cleanup

If this site reached No Further Action years ago, the original cleanup expenditures may be difficult to reconstruct. Restorical's forensic accounting team specializes in re-establishing and documenting past cleanup costs — even decades later — to build the strongest possible basis for an insurance recovery claim.

What We Look For

  • Historical insurance policies (pre-1986)
  • Policy numbers, carrier names, and coverage periods
  • Connection between contamination timing and policy period
  • Evidence linking cleanup obligation to insured activity

What We Deliver

  • Historical Coverage Chart
  • Trigger Analysis & Property/Policy Nexus
  • Coverage strategy with recommendations
  • Insurance funding for your remediation
  • Claims Management & Forensic Accounting

The Restorical Proven Process

Task 1 — Research and Analysis
Restorical searches for viable historical insurance policies, researches the site history, analyzes the contamination impacts, and underwrites potential coverage — including a proprietary trigger analysis. At the end of Task 1, we provide a clear yes or no on whether a successful cost recovery is possible, along with a strategy and recommendation specific to your situation, even if you are not the policyholder.
Task 2 — Cost Recovery
When Task 1 confirms viable coverage, Restorical works with your legal counsel to tender the claim and negotiate recovery of costs already incurred. Restorical's forensic accounting team re-establishes and documents past cleanup expenditures, managing the claim process to ensure the insurance companies fulfill their obligation in a timely manner.

Request more information on this property

Contact Us

This analysis is preliminary and based on publicly available records. Restorical Research is not a law firm and does not provide legal advice.